Metallbau Früh has joined the A/U/F in 2012, an association that takes care of a sustainable environmental protection by means of an optimised recycling process of aluminium products.
Metallbau Früh has joined the A/U/F in 2012, an association that takes care of a sustainable environmental protection by means of an optimised recycling process of aluminium products and as such contributes to an environmental friendly use of aluminium. The A/U/F ensures a qualified recovered substance cycle within Europe.
The visual mock-ups for the office facades, which are assembled from units with exceptional sizes of up to 4,5 x 6,15 metres and the residential facades have been successfully presented on 28.07.2016. The main features of the office facades are darkened stainless steel panels in various shades and stainless steel picture frames, which continue on the residential facades in combination with Portland Stone.
The mock-ups were approved by the Client and the Architect.
Metallbau Früh is Building Confidence accredited since 2011.
The annual audit has been successfully passed again this year.
Building Confidence is a collaborative supply chain accreditation standard designed for the construction industry, providing an effective solution for managing supply chain risk in the areas of safety, sustainability, CSR, quality and financial stability.
The visual mock-up replicating an extract of the glazed facades with decorative terracotta feature elements and shading cowls and the visual mock-up replicating the glazed facades with external glass fins have been successfully presented on 20.02.2015.
The mock-ups were approved by the Client and the Architect
The visual mock-up replicating an extract of the external cladding to Edgware Road incorporating glazed facade areas and white precast concrete elements has been succesfully presented on 20.07.2012.
The mock-up has been approved by the Client and the A