DE EN
  • Post Building, London
  • Post Building, London
  • Post Building, London
  • Post Building, London

Post Building, London

Execution period: 2016 - 2019


Scope of Works:

Complete building skin of the 9 storey building, incorporating:

  • Ground floor facades designed as thermally broken special construction made of aluminum and glass with decorative stainless steel cladding and stainless steel elements on the outside, including entrance door systems and escape doors
  • Canopies made of stainless steel and glass
  • Main entrance areas with automatic revolving doors with access control
  • Element facades in the office areas designed as thermally broken irregular sized special construction made of aluminum and glass with decorative stainless steel cladding and stainless steel elements on the outside
  • Element facades in the living areas designed as a thermally broken special construction made of aluminum and glass with stone cladding and decorative stainless steel elements on the
    outside
  • Vertical sash windows in special construction and special size
  • Fully glazed balustrades

 

Architect

Allford Hall Monaghan Morris (AHMM)


Client

Laing O'Rourke Construction South